When clearance conditions ask for green-belt evidence
Clearance and consent conditions commonly require green-belt development and reporting. Half-yearly compliance reports, and inspections by the SPCB or a regional office, ask for evidence of plantation and survival: which block, what was planted, and what is still standing. Contractor albums and spreadsheets lose that chain once a crew changes or a gap is replanted. The dates and the plantation evidence for that filing are in the half-yearly EC compliance report.
Oil refinery green belt monitoring is a typical starting point — a perimeter belt, a consent condition, and a report someone will sample. EC green belt compliance monitoring, in this workflow, means keeping that evidence ready for the report and the inspection. It does not mean a clearance requires any particular software product.
Mines keep their own page at mining green belt monitoring. Use that workflow for lease reclamation. This page is for the other industrial sites above, so the two are not duplicated.
